PLC glossary
Elapsed time
How much of a wait has passed so far. It is different from the target duration.
- Also called
- ET, timer elapsed
- On site
- The operator checks how long the valve has been commanded open without confirming movement.
- Siemens
- ET on the IEC timer instance.
- Rockwell
- ACC on the timer backing tag.