Recover the Interrupted Batch
Pause the batch safely. Restart it on purpose.
Start AND Permit starts filling: PumpOn and FillValve turn ON. Hold or Fault moves to the Batch held step and turns both OFF. This wins even if the tank reaches 70% at the same moment. Resume restarts filling only once Hold and Fault are both OFF. Level >= 70 moves to Complete: Done ON, PumpOn and FillValve OFF. MixerOn and DrainValve stay OFF throughout.
Pro missionHold stops filling; only Resume restarts it
Test 1 of 5HoldHold requestOFFResumeResume requestOFFPumpOnFill pumpOFFDoneBatch completeON- Level
- Advanced
- Time
- About 18 min
- Reward
- +300 XP
- Rig
- 3D process tank
- Siemens editors
- GRAPH
- Rockwell editors
- SFC
- Course stage
- 15. Prove a safe recovery
What the tests check
- Hold or Fault moves to Batch held.
- Batch held never restarts on its own.
- Resume works only after Hold and Fault are both OFF.
- A full tank (Level >= 70) completes the batch.
- Try it Use the buttons below the model and watch the rig respond.
- Test solution Every check runs on your code in one press.
- Replay If one fails, step through it one scan at a time to see why.
Where you’d see this on site
A drinks operator puts a batch on hold to look at a filling problem. Fixing the problem must not restart the equipment by itself.
A surprise restart can spill liquid while the operator is checking the tank. Resume must be a deliberate press, and must not work while the fault remains.
At a drinks factory, valves let measured amounts of water and syrup into a mixing tank. An electric mixer blends them into one batch. An outlet valve then sends the drink to a holding tank. Filling machines bottle it from there.
- Ingredient tanksHold the water and syrup
- Mixing tankFill, mix and measure one batchYou are here
- Holding tankKeeps the finished drink ready
- Bottle fillerPuts the drink into bottles
On a real site: places, parts and safety
- Drinks factory — blending water and syrup
- Paint factory — mixing ingredients into a consistent colour
- Water-treatment works — preparing a measured chemical mixture
- Brewery — heating water for washing equipment
A full tank does not close its own inlet. Water keeps arriving until the valve closes, so an open inlet can flood the room.
A heater that is not covered by liquid can overheat. Real tanks have separate safety devices as well as the PLC programme.
The sizes, timings and cutaways are teaching choices, not a drawing of any one real installation.
Next in the course
- Run, hold and recover a phaseUse a numbered state to run, pause and safely restart a mixing job.Advanced · 25 min · +300 XP
- Add four measured valuesPractise arrays on four readings before you build a filter.Applied · 12 min · +150 XP
- Average the last N readingsSmooth a noisy level. Average only the readings you have, and drop the oldest.Applied · 25 min · +300 XP
- Describe one pump with a structureKeep a pump’s data together under one tag name.Applied · 12 min · +150 XP